§ 86-94. Well operation permit.  


Latest version.
  • (a)

    Required; conditions to be met. The village may grant a permit to a private well owner to operate a well for a period not to exceed two years, provided that the conditions of this division are met. An owner may request renewal of a well operation permit by submitting information verifying that the conditions of this division are met. The village, or its agent, may conduct inspections or have water quality tests conducted at the applicant's expense to obtain or verify information necessary for consideration of a permit application or renewal. Permit applications and renewals shall be made on forms provided by the Village of Hartland Clerk. The following conditions must be met for issuance or renewal of a well operation permit:

    (1)

    The well and pump installation meet or are updated to meet the requirements of Wis. Admin. Code NR ch. 812.

    (2)

    The well construction and pump installation have a history of producing bacteriologically safe water as evidenced by one safe sample. No exception to this condition may be made for unsafe wells.

    (3)

    There are no cross connections between the well and pump installation and the municipal water system.

    (4)

    The proposed use of the well and pump installation can be justified as being necessary in addition to water provided by the municipal water system.

    (b)

    Fees. A fee set by resolution of the board shall be charged for the well operation permit issued by the village.

(Code 1991, § 13.08(5), (8); Ord. No. 763-09, § 1, 1-12-2009)